OPERATING ANDINSTALLATIONINSTRUCTIONSModels185, 265, 335, 405Swimming Pool and Spa Heaters181/182, 260/261, 330/331, 400/401Water Heaters and BoilersD
181-261 WH1 (Low NOx)10
SEQUENCE OF OPERATIONOn call for heat, the D-2 Power Vent fan (and appliance pump) start. When the flow switchcircuits close, the ignition system co
START UP PROCEDURESThe water system, the gas system and theelectrical system for the heater should becompleted and checked as per the heaterinstallati
ILLUSTRATED PARTS LIST13123456789101112131415
Raypak, Inc., 2151 Eastman Avenue, Oxnard, CA 93030 (805) 278-5300 FAX (800) 872-9725Raypak Canada LTD, 2805 Slough Street, Mississauga, Ontario, Cana
POWER VENT ASSEMBLYINSTALLATION, START-UP AND OPERATION1. RECEIVING EQUIPMENTOn receipt of your equipment it is suggested that you visually check for
33. INSTALLATION REQUIREMENTSThe equipment must be installed in accordance with local codes, or in the absence of local codes with thelatest edition o
4WIRING A POWERVENT ASSEMBLY TO AN APPLIANCE WITH IID IGNITION.WARNING: Disconnect all electrical power to the unit before servicing to avoid potentia
VENTINGThe vent pipe must be the same size or larger than what is indicated. The D-2 Power Vent arecapable of 360-degree discharge rotation and opera
6The Raypak Power Vent operates with a positive vent static pressure and with a vent gastemperature that avoids excessive condensate production in the
7 185-405 POOL HEATER (ATMOSPHERIC)
8 185-405 POOL HEATER (Low NOx)
9 182-260 WH1 (ATMOSPHERIC)
Commentaires sur ces manuels