WIRING CONNECTIONS
TO
UDB
P4
Fig. 24: Wiring Diagram (Factory Mounted)
Factory-Mounted
On Hi Delta heaters, the multi-stage Temp Tracker can
b
e ordered factory-mounted. The controller is already
powerd by the heater, the inlet and outlet sensors are
installed in the inlet/outlet header, and the controller
alarm is connected to the UDB diagnostic board. The
heater stage connections are also wired.