Raypak 850 Instructions d'exploitation Page 28

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 60
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 27
Venting Installation Tips
Support piping:
horizontal runs—at least every 5 ft (1.5m)
vertical runs—use braces
under or near elbows
Venting Configurations
For heaters connected to gas vents or chimneys, vent
installations shall be in accordance with the NFGC
(U.S.), or B149 (Canada), or applicable provisions of
local building codes.
Vertical Venting (Category IV)
Installation
The maximum and minimum venting length for this
Category IV appliance shall be determined per the
NFGC (U.S.) or B149 (Canada).
Table N: Category IV Vertical Vent & Vertical Direct Vent
1
Vent lengths are based on a lateral length of 2 ft. Refer to the latest edition of the NFGC for further details.
* Subtract 10 ft per elbow. Max. 4 elbows.
** Only Centrotherm polypropylene is approved for the XFyre product.
8
’ OR LESS
Fig. 22: Vertical Venting
Model No.
Certified Vent
Material
V
ent and
Intake Air
Vent Size
(in.)
Vertical Vent Height
1
(ft)
C
ombustion
Air Intake
Pipe
Material
Vertical Air
Inlet Max.
Length* (ft)
Min. Max.
300A
(Canada Only:
ULC-S636 PVC
and CPVC)
Stainless Steel,
AL29-4C,
ANSI/ASTM D1785
Sch 40 PVC,
ANSI/ASTM F441
Sch 40 CPVC
Polypropylene**
4
0 100
Galvanized
Steel,
PVC, ABS,
CPVC
100
400A
500A
700A
6
850A
CAUTION: This venting system requires the
installation of a condensate drain in the vent piping
per the vent manufacturer’s instructions. Failure to
install a condensate drain in the venting system will
void all warranties on this boiler. Condensate is
acidic and highly corrosive
NOTE: Ensure adequate clearances to allow annual
inspection of the venting system.
28
Vue de la page 27
1 2 ... 23 24 25 26 27 28 29 30 31 32 33 ... 59 60

Commentaires sur ces manuels

Pas de commentaire